India 5GWdc 2P & 4P Fixed Tilt Structure Project Hill & Desert & Plain Project
Oman IBRI 607MWdc Tracker Project Robot Installed in 2020 Global First Largest Single-phase Tracker Project
Abu Dhabi SWEIHAN 1.2GWdc 8L Fixed Tilt Project Robot Operation Started in 2019 High-Temp & High Corrosion, Desert Project
China Inner Mongolia 100MWdc Fixed Tilt Project Robot Operation Started in 2020 Cold Area & Plain Project
Dubai 100MWdc Rooftop Project
Thailand 128MWdc 6L Fixed Tilt Structure Project Robot Operation Started in 2020 High Humidity & Plain Project
China Jiangsu 100MWdc Lake Project Robot Operation Started in 2014
China Anhui 100MWdc Greenhouse Project Robot Operation Started in 2017